Tropicana Resort Aruba

Supply and installation of a native KMC BACnet automation and control system for the cold water chillers and hot water boilers. New refrigeration towers were installed with frequency drivers for the fans, three condensed water pumps and a chemical treatment system. Also, the hot water system was replaced with two new water-heater, hot water return and circulation pumps.
The complete installation is controlled by the Automation System (BAS) with KMC the TotalControl software.
The installer was our authorized distributor Pro-Tec Mechanical Contractors Aruba N.V.